It is time for an updated (21 June 2019) CRS report by Charles V. Stern is all that in spades: Columbia River Treaty Review, released on 1 June 2018. The US and Canada are involved in a review of the Columbia River Treaty (CRT) and this document provides an excellent updated review of the issues. There is a lot of misinformation about the treaty, and this report will elucidate the facts and issues.
Download CRS_Report_Columbia_River_Trety_Review_21June 2019
Summary
The Columbia River Treaty (CRT, or Treaty) is an international agreement between the United States and Canada for the cooperative development and operation of the water resources of the Columbia River Basin to provide for flood control and power. The Treaty was the result of more than 20 years of negotiations between the two countries and was ratified in 1961. Implementation began in 1964.
The Treaty provided for the construction and operation of three dams in Canada and one dam in the United States whose reservoir extends into Canada. Together, these dams more than doubled the amount of reservoir storage available in the basin and provided significant flood protection benefits. In exchange for these benefits, the United States agreed to provide Canada with lump- sum cash payments and a portion of downstream hydropower benefits that are attributable to Canadian operations under the CRT, known as the “Canadian Entitlement.” Some have estimated the Canadian Entitlement to be worth as much as $335 million annually.
The CRT has no specific end date, and most of its provisions would continue indefinitely without action by the United States or Canada. Currently, either the United States or Canada can terminate most provisions of the CRT with a minimum of 10 years’ written notice. To date, neither country has given notice of termination, but both countries have indicated a preliminary interest in modification of the treaty. If the CRT is not terminated or modified, most of its provisions would continue, with the exception of its flood control provisions (which are scheduled to transition automatically to “called-upon” operations at that time, meaning the United States would request and compensate Canada for flood control operations as necessary).
Perspectives on the CRT and its review vary. Some believe the Treaty should include stronger provisions related to tribal resources and flows for fisheries that are not in the Treaty; others disagree and focus on the perceived need to adjust the Canadian Entitlement to reflect actual hydropower benefits. The U.S. Army Corps of Engineers and the Bonneville Power Administration, in their joint role as the U.S. Entity overseeing the Treaty, undertook a review of the CRT from 2009 to 2013. Based on studies and stakeholder input, they provided a Regional Recommendation to the State Department in December 2013. They recommended continuing the Treaty with certain modifications, including rebalancing the CRT’s hydropower provisions, further delineating called-upon flood control operations after 2024, and incorporating into the Treaty flows to benefit Columbia River fisheries. For its part, the Canadian Entity (the Province of British Columbia) released in March 2013 a recommendation to continue the CRT with modifications “within the Treaty framework.” It disputed several assumptions in the U.S. Entity’s review process.
Following a two-year federal interagency review of the U.S. Regional Recommendation, the U.S. State Department finalized its negotiating parameters and authorized talks with Canada in October 2016. Between May 2018 and May 2019, U.S. and Canadian negotiating teams held six rounds of negotiations. Additional negotiations are expected in 2019.
If the executive branch comes to an agreement regarding modification of the CRT, the Senate may be asked to weigh in on future versions of the Treaty pursuant to its constitutional role to provide advice and consent. Both houses have also weighed in on CRT-related activities through their oversight roles.
“Patience, time and money accommodate all things.” – Spanish Proverb (tnx @AnnaWSears)